What should be decided after the test?
“Let us try the tool” describes an activity, not a sufficient pilot objective. Specify the uncertainty to reduce and what depends on the answer.
For example: can standard enquiries be prepared so that the responsible person has less total work without overlooking relevant information? This requires examining current effort, preparation quality and subsequent review. Producing a draft faster does not answer it.
What two weeks can achieve
Ten working days may suit a tightly bounded initial investigation if people, documents and enough cases are available. It is not a blanket promise that every technical or economic question can be resolved in two weeks.
The following is one possible format for an initial decision basis. Technical tests, rare cases or operational observation may take longer. Agree scope and duration during scoping. Even without implementation, the result may identify a process worth testing, a missing prerequisite or an idea not worth pursuing.
Days 1 to 3: understand the starting point
Agree the problem, process boundary and decision. Selected employees answer targeted questions; conversations and documents add context. Record questions, waiting and rework, and distinguish claims supported by cases from missing information.
Before collecting information, clarify responsibility, permitted data and access, and how the material will be used. These are part of the pilot’s agreed boundaries.
Days 4 to 7: test assumptions and compare options
Combine perspectives and review them with people who understand the work. Use contradictions to ask targeted questions: do teams differ, does a rule cover only standard cases, or is responsibility merely assumed?
Describe effect, effort and uncertainty separately. Keep multiple options open. An assistant might help, but better minimum information or a clearer approval path might be enough.
Ask: what observation would count against our preferred solution? If there is no answer, sharpen the test criteria.
Days 8 to 10: decide with conditions
Responsible people review what supports the decision and what is still missing. GO means the basis supports a named, bounded next step. ADJUST means the problem remains relevant but scope, prerequisites or approach must change. STOP means current evidence or expected effect does not justify continuation.
GO may depend on a clarified source or available review capacity. Explain STOP as carefully: which assumption failed, and when would reconsideration be reasonable?
Measure the entire workflow
In a fictional test, AI produces a draft faster but professional review takes longer because details need individual checking. Assess creation, checking and rework together, including quality and error risk. The fastest activity cannot stand in for overall value. This is an illustration, not measured customer evidence.
The role of AGENT 95
I developed AGENT 95 to connect targeted employee questions with traceable improvement decisions. Answers, sources and derived statements should remain linked. Professional review distinguishes a plausible story from a sound basis.
For the selected process, the aim is a decision paper covering the problem, available baseline, improvement options, assumptions, measures, responsibility and next step. The actual effect of an implemented solution must then be tested in its workflow.
A pilot does not automatically prove lasting savings or scalability. It is valuable when the next decision is better supported, including a documented no.